Before work on a project begins, the project objective must be clearly defined and checked for feasibility within the framework of a preliminary project. In this way, open questions can be clarified in advance in order to create the best possible starting conditions. The decisive factor is always the view of the overall system: the framework conditions must be fully known so that all relevant interfaces can be included and taken into account. These studies include all areas such as the catenary, energy supply system, charging and energy storage systems, as well as stations, workshops, tunnels, vehicle conversions and modernisations (refits).

Enotrac Team im Enotrac Sitzungszimmer

However, a project must not only be feasible in technical terms, but also in economic terms. Enotrac analyses the current market situation, contacts possible suppliers and obtains indicative price quotations. A well-founded assessment of the economic viability of various solutions can therefore be made before the optimal implementation option is developed.

Talk to our experts

Further services for Studies & Consulting

Reference projects