Our contribution
Enotrac has been commissioned by the Matterhorn Gotthard Railway (MGB) to refurbish the BDt 4361-4363 car train control cars for operation with the modernised HGe 4/4 II locomotives. As the main contractor, Enotrac is responsible for the overall project management and project planning, complete engineering, material procurement, vehicle refurbishment, commissioning and type testing, as well as the re-certification of the refurbished vehicles.
The refurbishment and modernisation includes the installation of numerous new systems and components (e.g. ZSI-127, HMI, PIS, V measuring system, etc.), the complete renewal of the vehicle control system (TCMS), adaptation of drivers’ desk to match the modernised locomotives, installation of a new wall door for motorbike and bicycle loading, implementation of various fire protection measures and the addressing improvements requests from operations.
-
Client
Matterhorn Gotthard Bahn
-
Period
May 2023 – December 2025
-
Location
Furka car shuttle train (Oberwald – Hospental)