About the project

Depending on the year of construction, Gardy SA drives are installed in the signal boxes throughout the MGBahn network. These components are no longer manufactured and are not compatible with today’s systems. In order to ensure operational safety and spare parts availability in the long term, the conversion of eleven signal boxes was planned and implemented. The new systems comply with the current MGBahn standard and enable reliable and future-proof control of the traction power supply.

Our contribution

Enotrac was responsible for the technical planning and construction supervision of the conversion as part of this project. The services included analysing the existing systems, planning the new equipment and ensuring compliance with the applicable standards and MGBahn’s internal standards. During the execution phase, Enotrac supervised the implementation on site and ensured that the new signal boxes were professionally installed and commissioned. Close cooperation with MGBahn and the contractor enabled efficient implementation and smooth integration of the new systems into ongoing operations.

Facts and Figures

0
Switching station
0 Y.
Planning and execution of the work
0 Mio
Conversion costs for all 11 switching stations
  • Client

    Matterhorn Gotthard Bahn

  • Period

    March 2024 to November 2025

  • Project Location

    Mattertal, Goms and Surselva, Switzerland

Our services in the project

Talk to our experts

Similar reference projects